How to run a job
This procedure describes how to run a BIRT report design executable (.rptdesign) file.
1  
2  
Choose the link to the report. You can choose either the file name or the version name. If the report executable uses parameters, Run—Parameters appears, as shown in Figure 3-1.
Figure 3-1  
3  

Additional Links:

Copyright Actuate Corporation 2012